Industrial & Mining Power Solutions

Define the duty.
Then define the equipment.

For factory distribution, mine-site infrastructure and heavy industrial procurement, start with how the plant operates: its loads, site conditions, continuity needs and connection points.

Discuss your project requirements

Factory distribution

Identify production lines, motor loads, shift patterns and planned expansion.

Mine-site infrastructure

State the installation location, process loads, access restrictions and site classification.

Heavy industrial duty

Flag large starts, cyclic demand and process-sensitive loads for technical review.

Procurement scenarios only; these are not project references or evidence of special-duty equipment capability.

02 / PROCUREMENT BASIS

Load Profile and Operating Duty

Describe what runs, when it runs and what changes during a production cycle.

Connected load and demand
Provide the load list, rated kW or kVA, power factor where known, expected simultaneous operation and measured demand if available. Separate existing loads from future additions.
Motors and starting duty
Identify the largest motors, starting method, starting current and duration where available, starts per hour and restart sequence. State the permitted voltage dip or ask the project engineer to define it.
Cyclic and impact loads
Describe crushers, conveyors, hoists, mills or other process loads where applicable. Share peak magnitude, duration and repetition; suitability for impact duty requires project-specific review.
Non-linear loads
List variable-speed drives, rectifiers and other power-electronic loads. Provide available harmonic data and operating combinations so the need for a power-quality assessment can be reviewed.
Continuity and recovery
Identify critical loads, acceptable interruption time, shutdown windows and restart priorities. Any standby supply, redundancy or transfer arrangement must be defined and agreed; uninterrupted operation is not assumed.

03 / PROCUREMENT BASIS

Environmental and Installation Constraints

Give actual conditions at the equipment location, including seasonal extremes and transport limitations.

01

Exposure and site conditions

State altitude, ambient temperature range, humidity, condensation, dust type and concentration, corrosion exposure and indoor or outdoor location. Any enclosure rating, cooling arrangement or special treatment requires written confirmation.

02

Space and civil interfaces

Share room or pad dimensions, ventilation information, cable routes, access clearances and available layout drawings. Identify foundation, fire-protection and oil-containment requirements for the project engineer to confirm.

03

Handling and installation

Specify delivery access, route restrictions, unloading arrangements, lifting limits and maintenance access. State vibration or mechanical shock requirements where relevant; capability is not assumed.

A mining application label does not establish suitability for underground use, explosive atmospheres or combustible dust. Identify the location classification and required evidence before equipment selection. High-altitude or harsh-environment suitability remains subject to project and manufacturer confirmation.

04 / PROCUREMENT BASIS

Questions Before Equipment Selection

Resolve the decisions that a capacity figure alone cannot answer.

  1. 01

    What supply is available?

    Confirm nominal and operating voltages, frequency, utility connection conditions and available fault-level information.

  2. 02

    What must remain in service?

    Identify the critical load groups and the operating condition during maintenance, supply loss and restart.

  3. 03

    What operating events govern the review?

    Highlight motor starts, sudden load changes, cyclic peaks and non-linear loads; identify who will provide the required studies.

  4. 04

    What limits the installation?

    Resolve site classification, environmental conditions, footprint, connection arrangement and transport constraints.

  5. 05

    Who approves the technical basis?

    Name the buyer, consultant, plant engineer and utility interfaces as applicable. List unresolved inputs and the owner of each decision.

05 / PROCUREMENT BASIS

Transformer and Distribution Equipment Scope

Use the equipment schedule to state what is required. A requested item is not a confirmed supply commitment.

01Operating duty
02Plant interfaces
03Supply boundary
REQUIREMENTSEQUIPMENTSUPPLY SCOPEILLUSTRATIVE PLACEHOLDER · APPROVED IMAGE PENDING
Reserved for this solution’s equipment supply context. No project evidence is implied.
Transformer package
Define quantity, voltages, proposed capacity, frequency, vector group, impedance, tapping and accessories. Final selection and guaranteed values require an approved technical schedule.
MV distribution
Identify incoming and outgoing feeders, switching arrangement, required fault ratings, protection and metering. Availability, configuration and applicable requirements must be confirmed for the enquiry.
LV distribution
List outgoing circuits, current requirements, protection functions, motor or drive interfaces and spare ways. Confirm which panels and accessories belong in the proposed supply.
Compact substations and components
If requested, define the transformer, enclosure, switching and connection boundaries, or provide component drawings and existing nameplate data. Published category names do not establish a complete available package.

The current public catalogue provides one published product detail page. Other equipment categories are enquiry scope only until a specific product and supply route are confirmed.

06 / PROCUREMENT BASIS

System Interfaces and Supply Boundary

Mark every connection and responsibility on the single-line diagram and scope schedule.

PROJECT INPUTINTERFACERESPONSIBILITYILLUSTRATIVE PLACEHOLDER · APPROVED IMAGE PENDING
Reserved for this solution’s system interface visual. No project evidence is implied.
Utility or upstream supply → incoming equipment
Confirm connection voltage, fault data, utility requirements, isolation boundary and the party responsible for approval.
Transformer → distribution equipment
Confirm cable or busbar termination, phase arrangement, neutral and earthing interfaces, physical connection details and protection coordination responsibility.
Distribution → plant loads and controls
Define feeder boundaries, motor/drive interfaces, interlocks, alarms, auxiliary power, metering signals and any requested communications protocol. Integration must be agreed explicitly.
Supplier → site team
Allocate equipment supply, drawings, testing, packing and delivery separately from civil works, unloading, installation, cabling, commissioning and energisation. Identify the responsible party for each; none is automatically included.
Project inputsTechnical clarificationAgreed supply scopeInspection & delivery requirements

The quotation and agreed scope schedule determine the included equipment, services, documents and delivery responsibilities.

07 / PROCUREMENT BASIS

Technical Documents and Project Inputs

Start with the documents already available. Mark unknown information as “to be confirmed” and assign a responsible contact.

01

Electrical basis

Single-line diagram (SLD), load schedule, utility data, existing nameplates and available load-flow, motor-starting, fault-level or power-quality studies.

02

Site and equipment basis

Site conditions, layout and access drawings, equipment specification, interface drawings and bill of quantities (BOQ), with revision numbers.

03

Review and delivery basis

Applicable standards and editions, destination requirements, requested drawings and records, inspection or factory-acceptance expectations, quantity and required delivery date.

Document availability, test scope, witness arrangements and delivery timing must be agreed for the selected equipment. Certificates, studies and test records are not promised by this page.

08 / PROCUREMENT BASIS

Related Published Products

Use the published detail as a starting point for a technical discussion, then confirm suitability for your operating conditions.

PUBLISHED PRODUCT / OIL-IMMERSED TRANSFORMER

35kV Oil-Immersed Power Transformer

The published series lists 50 kVA–40,000 kVA, primary voltage 33–38.5 kV, secondary voltage 0.4–11 kV and 50/60 Hz. These are reference ranges, not a guarantee that every combination is available.

Industrial applications are described on the product page. Mining suitability, site conditions, operating duty, accessories and final ratings require project confirmation.

Review published product details
Browse the published product catalogue

09 / PROCUREMENT BASIS

Scenario FAQ

Practical clarifications for industrial and mining enquiries.

Can equipment be selected from total installed kVA alone?

No. Provide the operating load profile, simultaneous demand, starting conditions and continuity requirements, together with the supply and site information. Ask the project engineer to confirm the selection basis.

Does the solution cover high-altitude, dusty or humid locations?

These conditions require project-specific confirmation. Supply actual site data and the required enclosure or environmental specification; this page makes no default claim of suitability or protection rating.

Is the published transformer approved for underground or hazardous mining areas?

No such approval is established by this page. Identify the location classification, applicable requirements and required product evidence. Do not infer underground, explosion-protected or combustible-dust suitability from the mining scenario.

Are MV/LV switchgear, controls and site works included?

Only when expressly listed in the agreed supply scope. State the equipment schedule, interfaces and services required so availability, responsibility and exclusions can be clarified.

Can a standby arrangement guarantee continuous production?

Continuity depends on the agreed system design and operating requirements. Provide critical loads, acceptable interruption time and restart priorities; redundancy, transfer performance and any guarantee must be confirmed separately.

What if the project documents are incomplete?

Submit the available SLD, load list, BOQ or brief. Mark assumptions and missing values clearly, and identify who will confirm them before final equipment selection.

Recommended next step

Carry the project brief forward.

Review equipment requirements ↗

10 / PROCUREMENT BASIS

RFQ Input Checklist

Bring the operating conditions into the enquiry from the start.

  • Project location, process and installation classification
  • Voltages, frequency, quantity and proposed equipment schedule
  • Load list, demand profile, largest motors and starting duty
  • Critical loads, interruption limits and restart sequence
  • Altitude, temperature, dust, humidity and other site constraints
  • SLD, layout, cable/busbar interfaces and existing equipment data
  • Scope boundaries, standards, inspection and document requirements
  • Delivery destination, access limits, schedule and technical contact

Share the information you have. Flag what still needs confirmation.

PROJECT BRIEFREVIEW INPUTSRFQILLUSTRATIVE PLACEHOLDER · APPROVED IMAGE PENDING
Reserved for this solution’s project enquiry visual. No project evidence is implied.
Submit project requirements

Final equipment suitability, supply scope and commercial terms are subject to technical review and written agreement.