Solar & Wind
Power Solutions

Application:Solar & Wind ↗

Define the generation interface.
Build a clearer equipment RFQ.

Prepare transformer and distribution-equipment requirements around your solar or wind project’s electrical system, site conditions and procurement stage.

Equipment selection and supply scope remain subject to project-specific technical review.

ENERGY FLOW / INTERFACESTwo sources.
Project-defined connections.

Renewable generation context CONCEPT ILLUSTRATION

Renewable generation context — illustrative sceneNeutral procurement illustration. This does not depict an ElevGrid project, installed equipment or approved engineering design.

Illustrative context only — not a project reference or an approved engineering drawing.

Review the project interface checklist
PV

Solar

Array → inverter AC output

WT

Wind

Turbine → generator / converter interface

Transformer & collection systemRatings · protection · equipment boundary
Grid connection interfaceUtility requirements · approval responsibility

Conceptual flow only. Confirm the actual topology and equipment locations on the project single-line diagram.

02 / PROJECT INPUTS

Solar and wind start with different inputs.

Input to clarifySolar PVWind power

Source interface

Solar PVIdentify string or central inverter architecture; provide inverter AC ratings, quantity and grouping.

Wind powerIdentify turbine model and generator / converter architecture; provide the OEM electrical interface requirements.

Transformer position

Solar PVLocate each transformer relative to inverter blocks, the collection system and any plant substation.

Wind powerDistinguish an individual turbine step-up transformer from a collector / grid-interface transformer.

Operating profile

Solar PVProvide generation and loading profiles, curtailment assumptions and any night-time reactive-power or auxiliary duty.

Wind powerProvide turbine output and loading profiles, start / stop behaviour, reactive-power duty and any OEM operating restrictions.

Physical integration

Solar PVConfirm standalone or packaged installation, inverter layout, cable routes and site access.

Wind powerConfirm tower, nacelle or external installation where applicable, space constraints and maintenance access.

A shared project rating does not make solar and wind transformer specifications interchangeable. Confirm the connected equipment, duty and installation before selecting a configuration.

03 / PROJECT INPUTS

Map the system. State the project stage.

Locate the equipment in the energy path, then match the enquiry detail to the information available.

PROJECT INPUTINTERFACERESPONSIBILITYILLUSTRATIVE PLACEHOLDER · APPROVED IMAGE PENDING
Reserved for this solution’s system interface visual. No project evidence is implied.
Mark these boundaries on your single-line diagram (SLD).Illustrative procurement sequence — not a construction or protection design.
  1. 01Source AC interface

    Inverter or turbine OEM data

  2. 02Transformer interface

    Winding data and terminations

  3. 03Collection / distribution

    Feeders, switching and protection

  4. 04Point of connection

    Utility boundary and metering

Concept / feasibility

Share the destination, preliminary topology, estimated quantities and target dates. Identify assumptions and unresolved inputs; request a preliminary review.

Tender / detailed design

Provide the latest SLD, specification, bill of quantities (BOQ), OEM interface data and utility requirements. Record document revisions and permitted deviations.

Procurement / replacement

Provide the approved technical schedule and interface drawings available. For replacement work, add nameplates, dimensions, cable connections and outage constraints.

04 / PROJECT INPUTS

Electrical & operating conditions

Ratings and winding arrangement
State required power and winding voltages, frequency, phase, vector group, neutral / earthing arrangement, impedance and tapping requirements. Identify which values are preliminary.
Duty and thermal basis
Describe the loading cycle, auxiliary or reverse-power operation if applicable, reactive-power duty, cooling arrangement and temperature-rise basis. Agree the rating basis with the connected-equipment data.
Power quality and switching
Provide available harmonic spectra, converter switching information, DC injection limits where relevant, energisation scenarios and power-quality studies. Confirm required analysis and mitigation responsibilities.
Fault and insulation coordination
Provide fault levels and duration, protection philosophy, insulation requirements and available earthing / surge studies. Confirm equipment ratings and coordination at each boundary.
Losses, efficiency and sound
State the destination and contractual loss, efficiency and sound criteria, including evaluation and test conditions. Guaranteed values require an agreed technical schedule; no universal performance values are assumed.

05 / PROJECT INPUTS

Site, installation & environment

Location and climate

Provide altitude, minimum / maximum ambient temperatures, humidity, condensation risk and solar exposure. Confirm the environmental design basis and any derating with the selected supplier.

Coastal, dusty or corrosive sites

Specify salt exposure, pollution, dust, sand and other corrosive conditions. Agree coating, enclosure, insulation and verification requirements against site and destination requirements.

Installation and access

Confirm indoor / outdoor location, footprint, ventilation, cable entry, terminations, lifting route and service clearances. For turbine integration, request the OEM dimensional and mechanical constraints.

Civil works and logistics

Identify foundation and anchoring interfaces, transport access, handling limits and storage conditions. Clarify responsibility for oil containment, fire provisions, flood and seismic requirements where applicable.

06 / PROJECT INPUTS

Equipment scope & grid interfaces

01Generation interface
02Collection system
03Grid requirements
REQUIREMENTSEQUIPMENTSUPPLY SCOPEILLUSTRATIVE PLACEHOLDER · APPROVED IMAGE PENDING
Reserved for this solution’s equipment supply context. No project evidence is implied.
Transformer package
Confirm the number and function of transformers, cooling, accessories, monitoring, terminations, spare parts and installation interfaces.
Distribution equipment
Identify required switchgear, feeder arrangements, compact / prefabricated substations and auxiliary distribution. Availability and package integration must be confirmed for the specific project.
Grid-interface items
Clarify metering, instrument transformers, protection relays, interlocks, earthing, communications and plant-control interfaces. Mark customer, utility, OEM and equipment-supplier responsibilities.
Studies, settings and approval
Identify who prepares and approves grid studies, relay settings, protection coordination and utility submissions. Grid connection acceptance must follow the project and destination requirements; it is not established by equipment supply alone.

Scope to confirm: listing an item here does not confirm that it is included, publicly documented or available as a standard ElevGrid package.

07 / PROJECT INPUTS

Technical clarification & deliverables

Clarify before quotation
Use a requirement register to record the source document, revision, responsible party, open question and agreed response. Separate confirmed inputs from assumptions and proposed deviations.
Agree the document schedule
Request the applicable datasheet, general arrangement, terminal / cable-interface drawings, schematics and accessory schedule. Confirm which documents are included, their review stages and language.
Agree verification and handover
Define inspection and test requirements, witness / hold points if needed, acceptance criteria, records, packing information and operation / maintenance documents in the contract.
Keep approvals traceable
Record the accepted technical baseline and control later changes. Confirm who releases documents and equipment for the next stage; deliverables and timing depend on the agreed supply scope.

08 / PROJECT INPUTS

Related published products

PUBLISHED PRODUCT / TRANSFORMERS

35kV Oil-Immersed Power Transformer

A published product to review against your project’s transformer requirements. Its listing does not establish suitability for an inverter interface, turbine installation or grid connection.

Confirm the application, connected-equipment data and required ratings before selection. No project-specific renewable-energy approval is implied.

EQUIPMENT ANATOMYILLUSTRATIVE / NOT TO SCALE
Oil-immersed transformer — conceptual component illustrationTank, radiators and bushings shown as an educational schematic. This is not a drawing or photograph of the listed product. 01 / BUSHINGS02 / RADIATORS03 / TANK
Concept illustration. Confirm the actual configuration and approved drawing for your project.
Review published product Browse published products

09 / PROJECT INPUTS

Scenario FAQ

Can one specification cover both solar and wind transformers?

Only after reviewing each duty and interface. Provide inverter or turbine OEM data, winding requirements, loading and installation conditions. Keep any shared requirements separate from application-specific requirements.

We only have a preliminary SLD. Can we start an RFQ?

Yes. Share the SLD revision, destination, project stage, estimated equipment scope and target schedule. Mark unknowns as “To be confirmed”; a preliminary enquiry does not establish final ratings or a confirmed offer.

Can the published transformer be used with our inverter or wind turbine?

That requires technical review. Share the OEM interface requirements, electrical duty, harmonic information, protection basis and installation constraints. A catalogue listing is not confirmation of compatibility.

Who confirms grid-code compliance and connection approval?

Identify the project engineer, utility / network operator and relevant approval parties. Provide the applicable grid requirements and allocate studies, controls, protection and submission responsibilities. Equipment procurement does not itself grant connection approval.

What should we provide for high-altitude, hot or coastal sites?

Provide measured or specified site conditions, including altitude, temperature range, humidity and salt / pollution exposure. Agree any thermal, insulation, enclosure, coating and test requirements for the project; suitability is not assumed.

Does a wind-turbine transformer standard cover the entire wind farm?

Do not assume this. The IEC/IEEE 60076-16:2018 catalogue distinguishes turbine step-up transformers from transformers connecting multiple turbines to a network. Confirm the applicable standard, edition and scope for each equipment item.

Are drawings, tests and commissioning included?

Confirm the document schedule, inspection and test scope, site services and commissioning responsibilities in the quotation and contract. They are not automatically included by this application page.

Recommended next step

Carry the project brief forward.

Review equipment requirements ↗

10 / PROJECT INPUTS

Your RFQ input checklist

  1. 01
    Project context

    Solar or wind; destination; project stage; quantity; delivery target.

  2. 02
    System and source

    SLD revision, BOQ, inverter / turbine OEM data and equipment boundaries.

  3. 03
    Electrical conditions

    Required ratings, winding arrangement, duty, fault data and available power-quality studies.

  4. 04
    Site and installation

    Altitude, temperatures, exposure, layout, cable interfaces and access constraints.

  5. 05
    Standards and acceptance

    Destination and utility requirements, specified editions, tests and document deliverables.

  6. 06
    Open points

    List missing inputs, assumptions, responsible parties and dates for confirmation.