Project control / Before dispatch
Testing &
Factory Acceptance
Align the equipment.
Agree the evidence.
Factory Acceptance Testing (FAT) is a project control point for checking equipment against the approved technical baseline. Define what will be checked, how results will be assessed and which records are needed before execution begins.
Discuss FAT requirementsReview the planning checklist
- Approved baselineSpecification · drawings · ITP
- Agreed verificationScope · witness points · criteria
- Traceable recordsResults · findings · disposition
Each stage needs an agreed basis for proceeding.
Project-specific scope. All inspection and testing depend on the product type, applicable standards, contract and approved Inspection and Test Plan (ITP). This guide describes planning considerations, not a confirmed test package.
01 / Establish the baseline
Define the FAT
Scope Early
A shared test list is only the start. Agree the technical references, responsibilities and acceptance criteria together.
- Equipment & boundaries
- Identify the product type, configuration, quantities and interfaces included in the inspection.
- Standards & criteria
- Confirm applicable standards and editions, contractual requirements, approved deviations and the acceptance basis for each item.
- Test items & witness points
- Agree the inspection and test list, hold or witness points, responsible parties and any separate evidence review.
- Documents & release
- Set the record format, review authority, issue resolution process and conditions for release.
02 / Prepare the inputs
Typical FAT Preparation
Resolve document revisions and open questions before fixing the inspection programme.
- 01
Approved Datasheet
Confirm the agreed ratings, configuration and technical requirements.
- 02
Drawings / SLD
Align current drawings and the single-line diagram (SLD), where applicable.
- 03
ITP / Test Plan
Approve scope, methods, criteria, responsibilities and witness points.
- 04
Open Point Review
Assign unresolved questions and identify any that prevent testing.
- 05
Witness Arrangement
Confirm attendance, notice requirements, access and the agreed format.
- 06
Record Format
Agree report templates, equipment identifiers and review signatures.
03 / Match the equipment
Test Scope by
Equipment Type
Use these review dimensions to start the scope discussion. They are illustrative and do not mean every item is performed on every project.
For every equipment group below, the final inspection and test scope depends on the product type, applicable standards, contract and approved ITP.
A / Transformers
Identity, electrical characteristics & accessories
- Datasheet, nameplate and drawing alignment.
- Dimensions, assembly and specified accessories.
- Agreed electrical checks, such as winding resistance, ratio and loss measurements, where applicable.
- Applicable insulation test requirements and associated evidence.
Oil-immersed and dry-type designs need their own scope. Confirm which routine, type or special test evidence is required; these are not interchangeable.
B / Substations & distribution
Assembly, interfaces & functional checks
- Equipment arrangement and approved SLD alignment.
- Specified ratings, component identification and enclosure details.
- Wiring, earthing, mechanical operation and interlock checks, as applicable.
- Agreed insulation and control or protection function checks.
Confirm the boundary between individual equipment tests and assembled package checks. Site commissioning requirements need separate agreement.
C / Components
Drawing conformity & traceability
- Part identification and approved drawing revision.
- Material records where specified and available.
- Dimensions, tolerances and mating interfaces.
- Workmanship, finish and agreed component-specific inspection or test records.
The inspection basis varies by component and use. A component record does not establish acceptance of the complete equipment.
04 / Agree participation
Witness &
Coordination
Confirm the witness method against the project’s actual capability and contract before making travel or scheduling commitments.
Buyer attendance or third-party involvement does not by itself constitute product certification.
On-site witness
Confirm the location, named attendees, permitted access, safety induction, schedule and hold points with the responsible parties.
Remote witness
Only consider this route when the facility and project parties confirm feasibility. Agree connectivity, camera coverage, identification, data visibility, confidentiality and interruption handling in advance.
Document review
Agree the records to be reviewed and who may accept them. Document review is not automatically a substitute for a required witnessed test.
05 / Follow the agreed plan
FAT Day Workflow
A typical coordination sequence. The approved ITP controls the actual order, hold points and authority to proceed.
- 01Align
Kick-off
Confirm participants, scope, references, safety arrangements and the day’s programme.
- 02Verify
Identification & Document Check
Match equipment identifiers to the approved documents and current revisions.
- 03Record
Inspection / Test
Carry out the agreed activities and record results against the approved criteria.
- 04Review
Findings
Log observations, deviations and incomplete items with an owner and required action.
- 05Resolve
Open Point Closure
Review corrective evidence and any required retest. Record the authorised disposition of outstanding items.
- 06Issue
Record Release
Issue the agreed record package after the required reviews. Apply contractual release conditions separately.
06 / Keep the evidence connected
Records and
Handover
Agree a document register that connects each delivered record to the equipment identifier, approved reference and relevant inspection or test item.
The handover contents, language, format, access permissions and issue timing depend on the contract and approved ITP. FAT records are project evidence; they are not a certificate library.
- Test reports & inspection records
- Identify the equipment, applicable procedure, results, criteria and required reviews.
- Photos & nameplate information
- Where agreed and permitted, connect visual records and identification details to the relevant equipment.
- Findings & closure records
- Link each open point to its action, supporting evidence and authorised disposition.
- Approved documents
- Include or reference the agreed datasheet, drawings, ITP and approved changes by revision.
07 / Buyer briefing
What Buyers
Should Confirm
Bring these decisions into the technical discussion early. Record the agreed answers in the project documents.
- 01 Standards
- Which standards, editions and project specifications apply?
- 02 Witnesses
- Who will attend or review, and who has acceptance authority?
- 03 Advance notice
- What notification period, schedule confirmation and rescheduling rules are required?
- 04 Language
- Which language is needed for discussions, reports and any translation?
- 05 Record format
- Which templates, file formats, signatures and equipment references are required?
- 06 Acceptance criteria
- Which limits and approved references determine acceptance, retesting and open point closure?
- 07 Third-party requirements
- Is an independent inspector required? Confirm appointment, scope, qualifications, access and reporting arrangements.
Connected project decisions
Keep the next steps connected.
Standards & Compliance
Clarify applicable standards before defining the test scope.
Before dispatchExport Packing & Delivery Coordination
Connect agreed release conditions with packing and dispatch planning.
Recommended Next StepRFQ Guide
Prepare the equipment inputs and documents for the project enquiry.
Next / Define your requirements
Make FAT part of
the project brief.
Share your equipment specification, applicable standards, proposed witness requirements and document expectations through the project enquiry page.
Scope and arrangements remain subject to product type, applicable standards, contract and approved ITP.