Export Packing & Delivery Coordination

Delivery planning starts with equipment dimensions, weight, sensitive components, destination conditions and agreed trade terms.

Bring these inputs into the quotation early so packing, documents and handovers can be reviewed against the actual supply scope.

Share your delivery requirements
Delivery preparationILLUSTRATIVE
Delivery preparation: conceptual workflowAGREED PACKING BASISHANDOVER RECORDS
Illustrative planning model. Packing, transport and responsibilities require project agreement.
Review the planning checklist
  1. 01
    EquipmentDimensions · weight · configuration
  2. 02
    Packing & recordsProtection · identification · documents
  3. 03
    Agreed handoverNamed place · trade term · responsible party
  4. 04
    DestinationAccess · unloading · receiving contact

Coordination scope and logistics services require project-specific agreement.

DELIVERY INTERFACEDefine each handover.Planning sequence · not a confirmed transport route

01 / DELIVERY PLANNING

Delivery Inputs Required Early

A destination name alone is not enough. Share the receiving conditions and commercial basis before the delivery scope is priced.

01

Country & destination

Identify the destination country, named port or terminal, and final site address where known. Distinguish the shipping destination from the site.

02

Trade term & named place

Provide the preferred Incoterm, the precise named place or port and the intended rules edition. Flag terms that still need commercial review.

03

Transport & handling

State any requested transport mode, unloading restrictions, lifting constraints, access limits or handling conditions.

04

Target date & receiving window

Explain whether the target is dispatch, port arrival or site receipt. Include site receiving hours and dependencies; a requested date is subject to confirmation.

05

Documents & packaging

List required documents, language, copies, marking instructions, packaging requirements and any receiving or storage conditions.

06

People & approvals

Identify the buyer’s delivery contact, consignee details and who approves the packing basis, document drafts and shipping instructions.

02 / DELIVERY PLANNING

Packing Basis by Equipment

The packing proposal should follow the equipment configuration, handling method and expected exposure. These are review factors, not fixed packing specifications.

Transformers

Confirm the shipping configuration, overall dimensions and weight, lifting information, sensitive fittings and any items removed for transport. For oil-filled equipment, obtain the manufacturer’s agreed transport condition and handling instructions.

Distribution equipment

Review enclosure dimensions, panel or section splits, exposed interfaces, internal restraints and moisture-sensitive parts. Confirm how each shipping section is identified and handled.

Components & accessories

Review fragility, exposed connection surfaces, corrosion or moisture sensitivity, quantities and separation needs. Agree protective materials and handling instructions for the actual items.

Any timber treatment, barrier protection, desiccant, weather protection or other packaging requirement must be checked for the destination and agreed supply scope. No standard packing grade is assumed.

03 / DELIVERY PLANNING

Equipment and Loose-part Identification

Agree a traceable packing list so the receiving team can match each package to its equipment and documents.

PROJECT / EQUIPMENT REFERENCE

One reference structure.

Use the agreed equipment tag or serial reference as the starting point.

  • Main equipmentEquipment reference ↔ main shipping unit
  • Removed partsParent equipment reference ↔ separate package
  • Accessories & sparesItem description + quantity ↔ package reference
  • Documents & marksDocument revision ↔ equipment and package list

Confirm package numbers, descriptions, quantities, weight and dimensions where applicable. Agree handling marks and document locations before dispatch; avoid labels that cannot be reconciled to the final packing list.

04 / DELIVERY PLANNING

Export Document Coordination

The document set depends on the contract, destination requirements and actual supply scope. Confirm who prepares, checks and issues each item.

Document preparationILLUSTRATIVE
Project document setIllustrative technical visual. Not a project record, approved drawing or evidence of completed work.PROJECT DOCUMENT SETSPECIFICATIONS / DRAWINGS / AGREED RECORDS
Illustrative document set. Actual deliverables depend on the project scope.
01

Commercial invoice

Check the agreed parties, goods descriptions, commercial references and trade-term details against the order.

02

Packing list

Reconcile equipment and loose parts, package references, quantities, and the final weight and dimensions supplied for dispatch.

03

Transport information

Confirm consignee and notify-party details, shipping instructions and the transport document required for the agreed mode. Issuance rests with the appropriate party.

04

Origin & project documents

Identify whether origin documents, inspection records or other project documents are required. Confirm availability, issuer, format and timing before committing to supply them.

The document list is a planning guide. Availability, certification and destination acceptance require confirmation; this page does not promise a complete customs document package.

05 / DELIVERY PLANNING

Delivery Coordination Workflow

Agree an owner, review point and required record for each stage. Dispatch readiness is a checkpoint; it does not confirm a transport booking or arrival date.

  1. 01

    Data Confirmation

    Align equipment data, destination, timing needs and trade terms.

  2. 02

    Packing Plan

    Review the shipping configuration, protection and handling basis with the responsible parties.

  3. 03

    Marking & Document Check

    Reconcile package references and document drafts; resolve discrepancies.

  4. 04

    Dispatch Readiness

    Confirm agreed release conditions, packing status and outstanding actions.

  5. 05

    Shipping Handover

    Record package count, visible condition and handover details with the responsible transport party.

  6. 06

    Arrival Coordination

    Align the receiving contact and access arrangements. Reconcile delivered packages and report discrepancies through the agreed process.

06 / DELIVERY PLANNING

Incoterms & Responsibility Boundary

State the Incoterm, named place or port and rules edition in the quotation. Confirm the delivery point and risk transfer separately from the destination.

COMMERCIAL AGREEMENT

Who arranges it?
Who pays?
When does risk transfer?

Keep these questions explicit for every handover. Paying freight to a destination does not necessarily mean risk transfers there.

ICC guidance on Incoterms® rules
Transport & handover
Identify the party arranging carriage, the agreed delivery point and the handover record.
Insurance
Confirm who arranges cover, the required scope, exclusions and evidence. Do not assume insurance is included.
Clearance & charges
Confirm export and import clearance roles, the importer and responsibility for applicable duties, taxes and charges.
Unloading & site work
Assign unloading, lifting, access preparation, storage and any site services explicitly. These are not automatically included.
Arrival & exceptions
Name the receiving party and agree how shortages, damage or delays are recorded and escalated.

ElevGrid’s coordination role does not automatically include carriage, insurance, customs clearance, unloading or installation. The agreed quotation and contract define the supplied scope.

07 / DELIVERY PLANNING

Oversized or Project Cargo Considerations

Where dimensions, weight or the shipping configuration may affect transport, obtain project-specific feasibility input from the responsible specialists.

01

Dimensions & weight

Confirm the final shipping envelope, gross weight, centre-of-gravity information and handling points with the equipment supplier.

02

Route & terminals

Review route restrictions, transfers, permits and proposed port or terminal handling conditions with the transport provider.

03

Lifting & site access

Confirm lifting arrangements, ground and access conditions, laydown space and the receiving team’s constraints before handover.

These are planning factors. Route surveys, permits, heavy lifting, port handling and specialist transport are included only where expressly agreed with the responsible provider.

08 / DELIVERY PLANNING

Pre-dispatch Checklist

Buyer and supplier should jointly review these points and assign an owner to every open item before the agreed dispatch release.

  • Equipment data agreed

    Final shipping dimensions, weights, configuration and handling instructions are available.

  • Packing basis reviewed

    Protection, restraint, sensitive parts and relevant destination requirements have been reviewed.

  • Packages reconciled

    Main equipment, removed parts, accessories and spares match the package references and quantities.

  • Documents checked

    Required drafts, issuer responsibilities, consignee details and revision status have been checked.

  • Responsibilities recorded

    Trade term, named place, risk transfer, insurance, clearance and unloading responsibilities are clear.

  • Handover prepared

    Release conditions, collection or shipping arrangements and the handover contact are confirmed by the responsible parties.

  • Arrival planned

    The receiving team has the package list, access information and an agreed way to record condition and discrepancies.

  • Open items resolved

    Remaining approvals, exceptions and timing dependencies have an owner and an agreed resolution.

09 / DELIVERY PLANNING

Make destination part of the RFQ.

Share your equipment scope, destination and preferred trade terms so the delivery requirements can be reviewed with the quotation.