Transformers
SCB14-2500/10-NX2 Dry-Type Transformer
2500 kVA dry-type transformer documented with 10 kV / 0.4 kV rated voltages, Dyn11 connection and AN cooling.
- Voltage Class
- 10 kV
- Rated Capacity
- 2500 kVA
- Secondary Voltage
- 0.4 kV
Product imageApproved media pending1600 × 1200px · 4:3
On this page
02 / Key specifications
Check the published ratings
Published product data. Unconfirmed items are omitted.
| Parameter | Published value |
|---|---|
| Electrical ratings | |
| Rated Capacity | 2500 kVA |
| Primary Voltage | 10 kV |
| Secondary Voltage | 0.4 kV |
| Frequency | 50 Hz |
| Phase | Three Phase |
| Vector Group | Dyn11 |
| Construction | |
| Tapping Range | ±2 × 2.5% |
| Electrical ratings | |
| Cooling Method | AN |
| Insulation Thermal Class | F Referenced test sample; report2024WT1560-4, qualification PDF54 |
| HV LI / AC Withstand Voltage | 75 / 35 kV Referenced test sample; report2024WT1560-4, qualification PDF54 |
| LV AC Withstand Voltage | 3 kV Referenced test sample; report2024WT1560-4, qualification PDF54 |
05 / Standards, testing & documents
Agree the acceptance basis
- Testing / FAT: request confirmation of routine, type, special tests and witness arrangements.
- Acceptance: agree required records before ordering; availability remains pending.
Testing / FATApproved media pending1600 × 1200px · 4:3
Technical document status
Project-specific documents and release permission are confirmed against project requirements.
Product Datasheet
Pending Supplier Confirmation
General Arrangement Drawing
Pending Supplier Confirmation
Dimension Drawing
Pending Supplier Confirmation
Interface Drawing
Pending Supplier Confirmation
Test / FAT Report
Pending Supplier Confirmation
Installation / O&M
Pending Supplier Confirmation
Packing Information
Pending Supplier Confirmation
07 / Project RFQ
Request project pricing
SCB14-2500/10-NX2 Dry-Type Transformer
Please specify the installation environment, required impedance and loss basis, dimensions and interface constraints, quantity and destination. Confirm the required test records and the final project configuration before quotation.